When it was first proposed in 2016, a downtown “Transit Center” drew little attention. Today some would argue that the latest rendition is in the wrong place.
More information Apply for a Home Depot credit card and seize the opportunity to earn $25 off on purchases of $25-$299, $50 off on purchases of $300-$999, or $100 off on purchases over $1,000.
The development costs require a stand-alone Bus Rapid Transit depot, stabling and operating system and “significant capital cost” to construct the Bus Rapid Transit pavement for the length of ...
Knife River's construction team is paving the way for the next stage of the Foothill Road project, entering Phase 3 from Normil Terrace to Cedar Links Drive, as drivers must brace for more detours ...
The U.S. Environmental Protection Agency has already prepared the site at 15701 E. Foothill Blvd. with spill control measures and plans to monitor air quality during operations set to begin next week.
The U.S. Environmental Protection Agency has already prepared the site at 15701 East Foothill Boulevard with spill control measures and plans to monitor air quality during operations set to begin ...