News

Low-cost, long-life, cycle-proof The 100% Merdeka-owned Tujuh Bukit project in Banyuwangi, East Java, is now completing optimisation studies.
Situated on the southeastern tip of Java, Tujuh Bukit is large, with the potential to produce annually at least 300,000 ounces of gold, 1 million ounces of silver and 100,000 tonnes of copper.
Tujuh Bukit, Indonesia NI 43-101 / JORC Compliant Technical Report Filed - Oxide mineral resource estimate increases confidence in deposit with 76% of contained gold in Measured and Indicated ...
Meanwhile, two new holes were drilled to follow up on previously reported drill hole GTD-137, which returned 85.85 metres at 0.56% copper and 1.11 g/t gold. The company said that while the drilling ...
BRISBANE, AUSTRALIA-- - Intrepid Mines Limited is pleased to report that assay results from recently completed drilling of the Tumpangpitu oxide gold-silver deposit has delivered a major upgrading ...
Ad hoc-Mitteilungen: Nachrichten»Intrepid Mines Limited: Tujuh Bukit Indonesia-Exceptional Drill Intercept / 676 meters (m) at 1.00 grams per tonne (g/t) Gold and 0.54 percent (%) Copper ...
PERTH (miningweekly.com) – Dual-listed Intrepid Mines has signed a settlement regarding the ownership of the Tujuh Bukit copper/gold project, in Indonesia, with the company also making plans to ...
Intrepid Mines Limited announces that a report entitled "Tujuh Bukit Project Report on Mineral Resources Located in East Java, Indonesia, Technical Report" effective 22 November 2012, has been ...