News
According to a Western Railway (WR) spokesperson, “Five steel girders, each spanning 41.80 metres, were launched for the Wankhede South foot overbridge between Churchgate and Marine Lines.
But was a dispute over the enormous steel girders supporting the stadium the defining crisis? Despite 3,500 people working on site, at the end of January this year, constructors Multiplex downgraded ...
Demolition of the stadium is scheduled to wrap up in July. PAWTUCKET − Over the centerfield fence, some 500-plus feet from home plate, an excavator grappled with blue steel girders ripped from ...
Mumbai: A major milestone was achieved early on Saturday in the construction of a second foot overbridge (FOB) for access to the Wankhede Stadium, as five massive steel girders were successfully ...
The original Wembley Stadium was built on a base of 25,000 tons of concrete to create foundations and the outside walls. 900 tons of steel girders supported the stands and terraces of the original ...
The department announced Sunday that the girders, which came from a fabrication shop in Bowling Green, Kentucky, arrived around 4:30 p.m. ODOT said the trailers carrying the large steel girders ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results