News
As a result, work was halted and plans were made to install both an upper soldier pile and lagging wall and a dewatering system. The soldier pile system incorporated a single level of earth anchors.
With a tied back solider pile and the most complex lagging system regarding numbers and installation, the Deep Foundations Institute announced its 2023 Outstanding Project Award Winner.
Engineers have recommended a "soldier pile and lagging wall" design to repair about 75 feet of the Saco River embankment that collapsed after heavy rains in October. Posted April 14, 2022.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results