News
The opposite end of the bridge features a 16.5 m long cantilever towards the existing Beanfield Centre, with no structural connection to the building.
"The Sky Bridge is a connection of three projects over more than a decade, and is a significant link between a historic building and a new building in an unobtrusive, light and transparent design ...
The proposed sky bridge would be connected to an addition built on the back of the convention center, located in the highlighted section. Drawing via AECOM, Inform Studio, Buro Happold, and ...
The bridge would connect Hotel X to the Beanfield Centre within Exhibition Place's historic Automotive Building. Image via NORR/City of Toronto.
Named Sky Bridge 721, it took two years to build, at a cost of 200 million crowns ($10.8 million Cdn), and is suspended by six main supporting ropes and 60 wind ropes.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results