News
That included 1,500 feet of 8-inch main lines, 8,500 feet of 3-inch pipe and 80,000 feet of 0.75-inch tubing. "We needed to have the rebar less than 10 inches" from the bottom of the site, he said.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results