News

At a 0.70 g/t cutoff, the reserve model estimated 660kt at 2.02 g/t whereas the ore control model, for a similar tonnage, results in 18% higher grade by increasing the cutoff to 1.0 g/t.
The Trident ORE is 1.3 Mt at 4.5 g/t Au for 188koz and includes an open pit ORE of 0.1Mt at 1.4g/t Au for 6koz. Supporting this ORE is a maiden Mineral Resource Estimate at the Trident open pit of ...
Action plan in place to resume in-pit access, annual guidance updated VANCOUVER, BC, Aug. 5, 2025 /CNW/ – Orla Mining Ltd.
In April we began mining from the high-grade Guapinol open pit with a reserve grade of 6.8 g/t gold and ore deliveries to the Libertad mill commenced mid May. The development of Eastern Borosi marks ...
The key assignment of the BelAZ trucks working at the local mine is to bring ore from an open pit to the processing facility where large pieces of rock are split into smaller ones as a stage of ...
Darren Hall, President and Chief Executive Officer of Calibre, stated: “I am pleased with the rapid progress at the Volcan open pit considering first ore delivery to the mill during July within ...
Javelin Minerals’ revised mining plan features a 15% increase in recoverable gold ounces to 39,000oz thanks to higher grades.
The results of this drilling demonstrate 29% more ore tonnes at a 1% higher grade for 30% more gold than the comparable area in the 2022 Mineral Reserve model at an ore-waste cut-off of 0.38 g/t gold.
Darren Hall, President and Chief Executive Officer of Calibre, stated: “I am very encouraged to report that Calibre’s Leprechaun open pit ore control drilling confirms grade and adds tonnage resulting ...
The results of this drilling demonstrate 29% more ore tonnes at a 1% higher grade for 30% more gold than the comparable area in the 2022 Mineral Reserve model at an ore-waste cut-off of 0.38 g/t gold.