News
Polsteam Dabie arrived in Duluth on Monday. The ship was built in 2024 and measures over 656 feet long, almost 78 feet wide and has a deadweight tonnage of over 37,500.
The Modified hours for Aerial Lift Bridge and Minnesota Slip Bridge’s operational changes are listed below. The Aerial Lift Bridge will remain in the lowered position from 7:00 pm until 11:00 pm.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results