Emergency crews respond after a midsize business jet skidded off the runway while landing and collided with another jet that was parked at the municipal airport in Scottsdale, Arizona, US on ...
The Columbus Airport has two asphalt runways. The other will remain open for most of the time that this project is ongoing, aside from a one-week span in which both will need to be closed.
The transport ministry said it will ensure a 240-metre (787-ft) long runway safety area at all airports to meet all relevant regulations. The area at Muan airport was about 200 metres long before ...
The final phases of a $4.8 million runway resurfacing project at LF Wade International Airport has been completed ... The project was undertaken by East End Asphalt Ltd and Lagan Aviation and ...